Direct Field Answer: Studio location power runs on 120V/208V 3-Phase 4-Wire Wye diesel generators fed by Series 16 single-pole Cam-Lok cables. Safe set electrical work obeys the Green β†’ White β†’ Black/Red/Blue make sequence (reverse on break), balances phase loads within 10%, and specifies Double-Neutral (2Γ— 4/0 AWG White) cables to absorb additive triplen LED/HMI harmonics.

1. Series 16 Cam-Lok Color Sequence & Ampacity

Hookup StepConductorJacket ColorNominal VoltageStandard 4/0 SC AmpacityBreak Order
1st ConnectedEquipment GroundGreen0 V Earth Reference400 A ContinuousLast Disconnected (5th)
2nd ConnectedNeutral (Double Return)White0 V Star Point400 A / 800 A (2Γ— 4/0)4th Disconnected
3rd ConnectedPhase A (L1)Black120 V to N / 208 V L-L400 A1st–3rd Disconnected
4th ConnectedPhase B (L2)Red120 V to N / 208 V L-L400 A1st–3rd Disconnected
5th ConnectedPhase C (L3)Blue120 V to N / 208 V L-L400 A1st–3rd Disconnected

2. Diagram: Make-Before-Break Cam-Lok Sequence & 3-Phase Wye Star

MAKE ORDER (CONNECTING): GREEN β†’ WHITE β†’ BLACK β†’ RED β†’ BLUE 1. GND 2. NEUΓ—2 3. L1 4. L2 5. L3 TRIPLEN HARMONICS (180Hz) DO NOT CANCEL IN NEUTRAL β†’ RUN 2Γ— 4/0 WHITE 100 kW Tow-Plant Max Leg Current β‰ˆ 292A @ PF 0.95 | Reverse Sequence On Strike

3. Three-Phase Power Capacity & Practical Math

  • Line Current Formula: $I_{\text{line}} = P_{\text{total}} / (\sqrt{3} \times 208\text{V} \times \text{PF}) \approx P_{\text{total}} / (360.26 \times \text{PF})$.
  • 100 kW Genny Reality: At 0.95 power factor, maximum continuous output per leg equals roughly 292 A (not 400 A!). Leaving 20% headroom protects against sudden 18K HMI strike transients and neutral harmonic heating.
  • 208V vs. 120V Circuits: Balanced 208V high-output ballasts draw across two hot Cam phases without pushing neutral return currentβ€”saving neutral copper capacity on LED stages.

Hardware Engineered for This Rigging Standard

1-1/2" Grid Clamp β€” Norms Studio Equipment
RGC-BPZSH-112
1-1/2" Grid Clamp
$66.00Shop >
20 Lbs Saddle Sandbag β€” Norms Studio Equipment
SSB-SBBAS-020
20 Lbs Saddle Sandbag
β€’ Color: Black
$43.00Shop >

Frequently Asked Set Questions

Q: What is the mandatory connection and disconnection order for Cam-Lok feeder cables?
Connect Green (Ground) first, White (Neutral) second, then Hot Phases Black, Red, and Blue last. When striking, reverse the exact order: disconnect all three Hots first, then White Neutral, then Green Ground last.
Q: Why do LED and HMI sets require double-neutral (200%) 4/0 feeder runs?
Non-linear switch-mode power supplies create 3rd-order triplen harmonics (180 Hz) that are in-phase across all three legs and add constructively in the neutral wire instead of canceling out, driving neutral amps past 130 to 170 percent of single-leg load.
Q: How close should A, B, and C phase currents remain on a 100kW tow-plant?
Keep phase leg amperage balanced within 10 percent across Black, Red, and Blue legs to prevent generator governor hunting, voltage sags, and harmonic overheating.
VERIFIED IN HOLLYWOOD, CALIFORNIA, USA β€’ EST. 1962

Put This Engineering Into Practice On Set

Sign in to leave a comment
Apple Boxes, Wedges & Dolly Track Cribbing Mechanics
True 9-ply 1/2 inch Baltic Birch structural specs (8,850 psi compression), standard Imperial Apple Box nested heights, and opposed-wedge track leveling.