CSATF Bulletin #25 & Power-Line Rules: What Changed For Cranes, Jibs & Boom Lifts

A field breakdown of CSATF's revised Camera Crane rules, sweeping power-line distance addendums (#22A, #23A, #25A), and ANSI/ESTA E1.21 outdoor structure compliance.
GRIPPING NEWS • Set Dispatches • HOLLYWOOD, CALIFORNIA, USA

CSATF Bulletin #25 & Power-Line Rules: What Changed For Cranes, Jibs & Boom Lifts

A field breakdown of CSATF's revised Camera Crane rules, sweeping power-line distance addendums (#22A, #23A, #25A), and ANSI/ESTA E1.21 outdoor structure compliance.

By The Norms Crew • Published 2026-11-18
Summary: Contract Services (CSATF) updated Safety Bulletin #25 (Camera Cranes) alongside sweeping power-line clearance addendums (#22A, #23A, #25A) governing cranes, boom platforms, and heavy Norms Studio Equipment grip gear—reinforcing Working Load Limit (WLL) inspections, safety factors, and ANSI/ESTA E1.2 / E1.21 structural rules across sets and outdoor festivals.

High-reach rigging—whether flying a telescopic crane on backlot concrete, extending a 1-1/2" Schedule 40 menace arm over talent, or spotting a Condor near street utilities—leaves zero room for informal guesswork. Under CSATF Safety Bulletin #25, CSATF Bulletin #22, and ANSI E1.21 outdoor structure rules, Competent Person pre-rig inspections and documented clearance zones are mandatory before elevating payloads.

CSATF & ANSI Overhead Rigging Compliance Matrix

Standard / BulletinCovered EquipmentCore Inspection & Safety MandatePrimary Reference
CSATF Bulletin #25 (Rev. July 2025)Telescopic cranes & manual jib armsCompetent Person pre-use check, counterweight swing exclusion zones, fall restraintsCSATF Bulletin #25
Addendums #22A, #23A, #25ABoom lifts, cranes, portable powerHarmonized high-voltage power-line standoff distancesCSATF Q2 Newsletter
CSATF Bulletin #22Scissor & extensible boom liftsTrained operator authorization (IATSE Local 80), floor bearing checks, harness tie-offCSATF Bulletin #22
ANSI/ESTA E1.2 & E1.216061-T6 trusses & outdoor structuresFatigue/crack chord checks & written wind-action strike plansANSI E1.2

The Norms Crew Take: Traceable Steel Across Film, Live Stages & Theme Parks

Whether deploying a compact jib on an episodic stage, clamping truss grids at an outdoor festival, or rigging seasonal show lighting inside a destination park, traceable hardware beats improvised adapters every time. Anchor manual jib setups on a Jib Yoke & Dan Stand 1R Kit, lock 1-1/2" Schedule 40 pipe with ASTM A536 1-1/2" Grid Clamps with Junior Receiver (6-Pack), and support high overheads with a Mombo Walker Stand 4R (protected by the Norms 2025+ Lifetime Stand Warranty) or triangulated Menace Arm Kit.

Run live bridle and ballast checks on Gripedia Rigging Calculators and read Speed-Rail, Grid Clamps & Box Truss Span Engineering.

Frequently Asked Questions

  • Does CSATF Bulletin #25 apply to manual jib arms as well as Technocranes? Yes—it covers both powered telescopic cranes and manually operated counterbalanced camera cranes and jib arms.
  • What do ANSI E1.2 and E1.21 require for outdoor grids? Both standards mandate pre-rig fatigue inspections on 6061-T6 truss chords/pins and documented wind-strike plans for outdoor temporary structures.

Verified Sources & Primary Citations

Referenced Norms Equipment in This Dispatch

Jib Yoke & Dan Stand 1R Kit — Norms Studio Equipment
GST-USZDC-1W3
Jib Yoke & Dan Stand 1R Kit
• Material: Steel
• Weight: 13 lbs
• Max H: 6' 6"
$437.00Shop >
Mombo Walker Stand 4R with Leveling Leg Steel - 1-1/4" Leg — Norms Studio Equipment
GST-HSVMM-4W4
Mombo Walker Stand 4R with Leveling Leg Steel - 1-1/4" Leg
• Material: Steel
• Weight: 53.5 lbs | 24.3 kg
• Max Height: 23' | 702.9 cm
$823.00Shop >
Menace Arm Kit — Norms Studio Equipment
BAM-KVRXX-112
Menace Arm Kit
$210.00Shop >
Sign in to leave a comment
Set Dispatch: Outdoor Overhead Wind Thresholds & CSATF Bulletin Compliance
Why wind pressure jumps 48% at 25 feet above street level and how Key Grips enforce guy-wire, porous-rag, and anemometer strike limits on location.